Winterhalter under counter dishwashing machines UC Series Repair manual
8 Exchange collector
9 Procedures Required material: Kit collector Item no. 30 000 169 Tool: no special tool required Important note: The machine must be de-installed
10 Exchange collector (continuation)
11 Procedures (continuation) Disconnect boiler heating element Remove the hose at the back of the boiler Pull off the thermo sensor that is locat
12 Exchange collector (continuation)
13 Procedures (continuation) Unplug the circulating pump Pull off the waste water hose that is connected to the upper distributor Loosen clamp at
14 Exchange boiler heating element
15 Procedures Required material: Kit heating element 4.9KW with fuse Item no. Kit heating element 6.5KW with fuse item no. 30 000 124 (Japan, Austra
16 Exchange boiler
17 Procedures Required material: Kit boiler UC-S: Item no. 30 000 119 UC-M; -L; -XL Item no. 30 000 120 Tool: no special tool required Important no
Table of contents Introduction-------------------------------------------------------------------1 Drawings------------------------------------------
18 Exchange the pressure transmitter of the boiler The following manual applies for the UC-M; -L; -XL. In models of the UC-S Series the boiler is loc
19 Procedures Required material: Pressure transmitter Item no. 31 24 044 Tool: no special tool required Observe the safety notes on page 7 Remov
20 Exchange tank heating element
21 Procedures Required material: Kit high power heating cartridge 1.8KW Item no. 30 000 122 Kit high power heating cartridge 2.5KW Item no. 30 000 1
22 Exchange pump head (dosing device Fluidos)
23 Procedures Required material: Pump head for Fluidos DT (detergent) Item no. 31 02 599 Pump head for Fluidos DT (rinse aid) Item no. 31 02 600 Too
24 Exchange dosing device Fluidos
25 Procedures Required material: Kit Fluidos DT (detergent) Item no. 31 02 597 Kit Fluidos DB (rinse aid) Item no. 31 02 598 Tool: no special tool
26 Exchange integrated water softener
27 Procedures Required material: Kit softener Item no. 83000420 Item no. 83000421 (Japan) Tool: Ring wrench 60003376 Important note: The machine m
1 Introduction The machines of the UC Series are no longer distinguished by their intended use but by their size. The machine name is derived from t
28 Exchange integrated water softener (continuation)
29 Procedures (continuation) Unscrew the terminal block and grounding cable De-install right flute of the strike plate Sideways, unscrew the boil
30 Exchange heat exchanger / radial fan
31 Procedures Required material: Kit heat exchanger Item no. 30 000 190 and / or Kit radial fan Item no. 30 000 189 Tool: Ring wrench 60003376 Impo
32 Exchange heat exchanger / radial fan (continuation)
33 Procedures (continuation) Cut through the belts on the intake socket and remove the hose Installation of the new heat exchanger (item no. 30 000
34 Flow schema Model: Standard (not for UK, Australia) 23451 1: Solenoid valve (4 l/min); cold or warm water 2: Backflow protection type "BPD&q
35 Model: Standard (for UK, Australia) 23451 1: Solenoid valve (4 l/min); cold or warm water 2: Backflow protection type "Airgap" 3: Boile
36 Model: integrated water softener 23456 71 1: Solenoid valve (4 l/min); cold or warm water 2: Backflow protection type "Airgap" 3: Water
37 Model: Energy 324561 1: Solenoid valve (3 l/min); cold water 2: Backflow protection type "Airgap" 3: Heat exchanger 4: Boiler 5: Rinsin
2 Drawings UC-S UC-M UC-L UC-XL UC-S Energy / UC-M Energy UC-L Energy; UC-XL Energy a By removing the feet the machine height is reduced by
38 Model: Energy / integrated water softener 423567 81 1: Solenoid valve (3 l/min); cold water 2: Backflow protection type "Airgap" 3: Wat
39 Options of the water treatment UC with integrated water softener 123UC Water supply max. 60°C Total hardness: max. 30 °dH Copper concentr.: ma
40 UC with upstream desalination (TE 15 / TE 20 / VE 15 / VE 20) 123T / V UC4 Set parameter: P503 = 1 P511: max. 999 (99.9 m³) 1: Water shut-off val
41 UC with upstream reverse osmosis (RoMatik 160, 210, 420) 12R UC75 6DA3Fe4 1: Water shut-off valve 2: Dirt trap (included in delivery of the UC) 3
42 Requirements for a good cleaning result The "Sinner circle” describes the effective impacts in the cleaning process. These can be divided int
43 Factor mechanics Possible causes for a bad cleaning result are: 1. Contaminated or clogged nozzles 2. Contaminated or clogged filter system 3.
Winterhalter Gastronom GmbH Commercial Dishwashing Systems Tettnanger Strasse 72 88074 Meckenbeuren · Germany Telephone +49 (0) 75 42 4 02-0 Telef
3 Rotary or alternating current? The machine can be connected both to rotary and alternating current. If the machine is put to another location, the
4 Install and connect the mains connection cable Requirements to the mains connection cable 1. Use a cable of the type H07 RN-F or equivalent 2. Se
5 Menu-driven first start-up Shortened version The detailed description can be found in the commissioning regulation of the UC Series. Select langu
6 Save addresses for service and chemicals Enter date of day, time and date of first start-up Summary of the changed parameters Switch on the ma
7 Repair instructions Exchange collector --------------------------------------------------page 8 Exchange boiler heating element -------------------
Hello, im noob :)